Asphaltic Concrete Enterprise Limited
Client – National Works Agency
Completed in 2015
This was a Civil Engineering project that included cleaning storm water drainage systems and removing vegetation. There was also concrete works – Kerbs, Rip Rap Walls- and we expanded the existing roadway; base work, milling of existing asphalt surface, preparation of formation, prime coat, paving and road marking were also part of the project.